Structural Steel Erection

Tuscaloosa Steel

Tuscaloosa, Alabama
  • Fast Track Project
  • Received a disassembled Steel Mill from Glasgow, Scotland
  • Erected 7,500 tons of structural steel
  • Re-furbished & installed 4 Overhead cranes​
  • Retrofit approximately 5,000 tons of steel to meet
  • Peak manpower – 77