Structural Steel Erection
Tuscaloosa Steel
Tuscaloosa, Alabama
- Fast Track Project
- Received a disassembled Steel Mill from Glasgow, Scotland
- Erected 7,500 tons of structural steel
- Re-furbished & installed 4 Overhead cranes
- Retrofit approximately 5,000 tons of steel to meet
- Peak manpower – 77